Dudley Magistrates Court

Client Ministry of Justice

Principle Contractor G4S

Main Contractor IFS

Value £250K

Duration 24 Weeks

Working Hours Out of Hours

G4S are a leading provider of TFM services to the Ministry of Justice. IFS are an approved supplier to G4S and have achieved Critical Contractor status.

In addition, we are part of the G4S framework agreement for the supply of projects, planned preventative maintenance and reactive works throughout the United Kingdom.

Following a detailed survey of the property it was apparent that the existing render cladding had delaminated from the structural blockwork. It was not deemed viable to undertake patch remedial works so the scheme was based upon a 100% removal of the existing cladding. Remedial repairs to the structural blockwork and a comprehensive quality controlled installation of the new cladding system. After going through the required competitive tender procedures, IFS were successful as the preferred
main contractor to execute a full replacement of the existing rendered surfaces using K Rend (Eco) spray applied rendering system.

• The project required the removal of the existing sand and cement rendered elevations. Together with remedial works to existing cracks and damaged structural areas.
• Due to the multi level nature of the building, fixed scaffolding was not deemed viable so access to the works was achieved via all terrain access platforms.
• The works were executed in a fully occupied building environment, including coordinating access into the staff and judge’s car park.
• Shift working was adopted throughout the evenings and weekends with occasional daytime working.
• No reportable accidents or near misses were recorded during the project.
• 6,480 man hours of activities undertaken on the project without any incidents.
• Fully detailed RAMs and permit to work systems were operated throughout the project.