Intelligent FS

Experts in the built environment

IFS provide a comprehensive package of construction services across the UK.  Our national reach is achieved through a highly valued and respected supply chain.  Contractors who are proven to deliver first class work in their respective geographical locations.  We are currently on-site delivering projects upto £7.5 million.

Projects include a £7.5 million envelope scheme in the North of England incorporating the replacement of existing timber, zinc & masonry cladding. Other projects have included a £1 million envelope scheme in the North West incorporating Rainscreen and Renderbrick proprietary cladding systems together with the installation of high-performance window units.

Intelligent FS operate in a variety of sectors including HMP, the MOJ (Courts Division), Retail, Laboratories, Analytical Clinics together with Commercial and Industrial projects.

SECTORS

Government

Working in partnership with government contractors to deliver projects on-time within budget.

Education

Delivering educational projects within guidelines and timeframes that work with our clients tight schedules.

Healthcare

We have extensive knowledge of delivering projects in the healthcare industry. Navigating timeframes with health and safety.

Leisure

From gym's and swimming pools to casino's and events venues. We help deliver from planning to build.

Commercial

With a specific understanding of the unique requirements of commercial organisations, we deliver projects for sustainable, financial and aesthetic value

Energy

Specialists in the supply and fit of energy production systems in both Residential & Commercial projects

Company & Approach 

Intelligent FS is a Principal Contractor in the Construction industry and provider of Single FM services. We are specialists in Cladding remediation, Cleanroom and Laboratory fit-out, and luxury Residential Renovations. 

We have an exceptional reputation in the market as a Principal  Contractor within the built environment, known for high quality, safe,  efficient, and compliant projects. This provides us with an edge against many traditional construction firms of our size, unable to scale to include all aspects required by larger projects (including  Commercial and Stakeholder Management, Access Considerations – working alongside utilities, waterways, railways and Occupant Liaison to name just a few). The resulting turn-key solution we offer is rare in the market unless you engage the top 50 construction companies where cost bases are considerably higher and flexibility and speed to  mobilise much lower. 

Intelligent FS’s approach to delivery; including Relationship  Management, Expert Knowledge, Flexibility, Communication and  Quality of Service, means that projects are more cost-effective, better managed and controlled and both lead times and project delivery times are reduced. Our Health & Safety, Environmental and Quality  Management processes are backed by robust systems and the use of technology wherever this makes us more efficient. Our supply chain is extensive and well managed and supports transparent communication, pricing and enables us to maximise recycling and waste management opportunities. 

{

“The quality control and installation compliance process adopted by IFS was perfect.”  This project was finished to such a high standard that the MOJ is using it as a benchmark for future recladding projects.”

Keith Telfer – Project Sponsor (North & Scotland)

Areas we supply:

Design & Build

Mechanical

Electrical

Repairs

Air-Conditioning

Experienced Construction Specialist’s

Intelligent FS are a lean and agile organisation structured to deliver bespoke services to a range of industry sectors. Offering the vast experience and knowledge of major providers but with an ability to change direction and realign services to meet our clients evolving business needs. Change does not have to continually link to additional cost.

 

By engaging at the pre-construction phase, we can bring added value and design engineering alternatives which bring reduced costs and improved workflow.  We constantly find that the use of arm’s length design solutions brings its own challenges that can be expensive to address during the construction phase.

MILLINERS WHARF – 450 APARTMENT BLOCK, MANCHESTER

MILLINERS WHARF – 450 APARTMENT BLOCK, MANCHESTER Following a fire safety inspection, it was found that there was a lack of suitable cavity barriers (and therefore fire separation) within the outer insulation layer of the rainscreen cladding at the party wall positions, the PIR installation inside the cavity was also…

THE SUTTON – 41 APARTMENT BLOCK – SUTTON COLDFIELD

THE SUTTON – 41 APARTMENT BLOCK – SUTTON COLDFIELD Following an initial specialist fire report commissioned by the client, Intelligent FS were called in to propose a solution to address the immediate safety concerns. Intelligent FS proposed a turnkey solution to include replacement of the collapsed, fallen and broken cavity…

ST. CRISPINS – 270 APARTMENT BLOCK – MANSFIELD

ST. CRISPINS – 270 APARTMENT BLOCK – MANSFIELD Following an Intelligent FS survey, it was discovered that brickslips had been installed on PIR insulation from ground level and in some elevations all the way up to the top floors. This insulation is tested to BS EN 13501-1 and achieves a…

WOOD LANE STUDIOS, LONDON – 4,000m 2 HIGH RISE BUILDING

WOOD LANE STUDIOS, LONDON – 4,000m 2 HIGH RISE BUILDING Delivered with a strategic delivery partner Complete Façade Systems, this fire remedial works project presented numerous challenges including residents remaining in possession of the properties, access constraints and temporary weather proofing of the remedial works. An initial Consultancy report was…

Dudley Magistrates Court

Client Ministry of Justice Value £250K Duration 24 Weeks Principle Contractor G4S Dudley Magistrates Court OVERVIEW Following a detailed survey of the property it was apparent that the existing render cladding had delaminated from the structural blockwork. It was not deemed viable to undertake patch remedial works so the scheme was based upon…

Burnley Combined Court

Burnley Combined Court OVERVIEW The exact scope of works included local removal of existing elevation finishes. Installation of a new waterproof membrane. Bolting a new stainless steel structural Metsec matrix into the existing masonry fabric of the elevations. Installation of new compliant insulation batts and fire cavity closers. Applying new…

Messenger
Email
WhatsApp
Messenger
WhatsApp
Email